Li-ion: The Sky’s the Limit

Li-ion: The Sky’s the Limit

​Picture a medical facility and the only place to install a new UPS system is within a Glass Reinforced Plastic (GRP) building or a container on the roof top.  Immediately, there will be challenges with weight and space.  Although GRP’s are designed to be light,...
Getting the Best from Your Batteries

Getting the Best from Your Batteries

How can facilities maximise performance and get the best from their batteries? Aaron Oddy, sales engineer at Centiel UK examines the issue. Batteries make up around 50% of the cost of a UPS purchase, so maximising their design life is essential. VRLA batteries usually...
The Dark Side of Service

The Dark Side of Service

By Andrew Skelton, Operations Director, CENTIEL UK Having spent many years in the UPS and Generator industry, one of the most common mistakes I come across, is when equipment has been purchased and it’s not been looked after properly.  Imagine buying a brand-new car...
Failure is Not an Option

Failure is Not an Option

By Mike Elms, Managing Director, CENTIEL UK Apollo 13 was due to be the third crewed mission to land on the moon.  Famously the mission was aborted when an oxygen tank ruptured just three days into the mission, resulting in loss of oxygen supply capacity and putting...
03300 567 567 sales@centiel.co.uk Sign up to our mailing list Follow us on LinkedIn